Hurlstone Park – Complying Development
|Test text
Shortlisted entry “The Changing Spiral” Due to seasonal flooding of the adjacent Mary River, the facility had to be located at least 3.6 metres above existing ground level. At the same time the facility had to be accessible to people in wheelchairs, which required a 1 in 14 slope ramp to be provided. With an